Back to Components
ECL-12Clinical Support Set 3

Equipment Clean-Up/Loan Equipment, 12m2

Standard Area12
Ceiling Height2700mm

Briefing

Description
The Equipment Clean Up Room is used for cleaning of equipment used in patient care or loaned to outpatients following return.
Hours of Operation
Up to 24 hours (dependent on unit operating hours)
Occupancy
1-2 staff intermittently
Additional Considerations
~ Storage will be required for holding cleaning equipment.

Performance Requirements

HVAC

Ventilation (Supply)Ventilation (Exhaust)

Lighting

General

Items

CodeDescriptionQtyPriorityCategoryComment
AFDPR-006.01DOOR PROTECTION: plate, to 900H1StandardInternal - Door 1[DWPR-005] to corridor side, extent dependent on movement of beds and mobile equipment in adjacent area; to be coordinated with corridor wall protection
AFDPR-006.01DOOR PROTECTION: plate, to 900H1StandardInternal - Door 1[DWPR-006] to room side
AFDPR-056.03DOOR FRAME PROTECTION: full wrap, to 1200H1OptionalInternal - Door 1[DWPR-010] optional, provision and extent dependent on frame material/finish and movement of beds and mobile equipment in adjacent area
DOHI-017.01DOOR: hinged, 1 leaf, 1100 clear opening, solid, standard vision panel1StandardInternal - Door 1[DWGL-020] lockable

Command Bar

Search for components and navigate the app