CLNUPOperating
Clean-Up Room
Standard Area12m²
Ceiling Height2700mm
Briefing
Performance Requirements
HVAC
Air Conditioning (General)Ventilation (Exhaust)
Lighting
General
Items
| Code | Description | Qty | Priority | Category | Comment |
|---|---|---|---|---|---|
| AFDPR-006.01 | DOOR PROTECTION: plate, to 900H | 1 | Standard | Internal - Door 1 | to both side of the door leaf |
| DOHI-015.01 | DOOR: hinged, 1 leaf, 1000 clear opening, solid, standard vision panel | 1 | Standard | Internal - Door 1 | sliding door may also be acceptable dependent on infection prevention and control and work health and safety policies, provision of manual hold open device to be confirmed to suit operational requirements |