Back to Components
ADLKAllied Health

ADL Kitchen

Standard Area12
Ceiling Height2700mm

Briefing

Description
The ADL Kitchen provides an accessible space for the training and assessment of patients in Activities of Daily Living (ADL) tasks. The space is to be functional for a range of patients including wheelchair users.
Hours of Operation
Up to 24 hours (dependent on unit operating hours)
Occupancy
1-2 patients; 1-2 staff
Additional Considerations
~ The kitchen can include a combination of fittings and appliances such as a sink, cooktop, oven/grill, microwave and refrigerator to support common ADL training and assessment tasks as per service requirements. Room exhaust to be provided to range hood over cooktop. ~ An operational model for responding to calls from staff/patients will be needed to support the inclusion of a nurse call system and is to be determined based on service requirements. If multiple ADL rooms are combined into an ADL suite nurse call buttons can be rationalised into a central location. ~ The room may be enclosed with a lockable door depending on security requirements. ~ External outlook and access to natural light is desirable.

Performance Requirements

HVAC

Air Conditioning (General)Ventilation (Exhaust)

Lighting

General

Electrical

Body Protected

Items

CodeDescriptionQtyPriorityCategoryComment
AHWCV-001WINDOW COVERING: blind, roller, single1StandardInternal - Window 1[DWWD-004]
WIFX-161.01WINDOW: fixed, external, double glazed, sill at 1500H1StandardInternal - Window 1[DWWH-005] desirable

Command Bar

Search for components and navigate the app